Early design stages

Scoping Report

The Uisenis Wind Farm is still in the early design stages with environmental surveys ongoing. In August 2022, Eurowind Energy submitted a Scoping Report to the Scottish Government, which summarises the environmental surveys and assessment required to be submitted as part of the application for consent. Following completion of these surveys and public consultation, the design will be refined and finalised, with an analysis of its potential effects submitted with the application in 2023.